MIL-DTL-0048683B (AR)
TABLE II. First Article Inspection.
TITLE
DRAWING NUMBER
See Below
1
2
SHEET
OF
Projectile and Components
NEXT HIGHER ASSEMBLY
N0. OF
REQUIREMENT
INSPECTION METHOD
EXAMINATION OR TEST
SAMPLE
PARAGRAPH
REFERENCE
UNITS
Firing Pin Assembly
(Dwg. 9399391)
Push Test, Firing Pin Assembly
50
3.2
4.5.1
Ogive, M918 TP (Dwg. 9399394)
Salt Spray
4
3.2
4.5.2.1
Spring, Anti-Creep (Dwg. 9399408)
Load Test
50
3.2
4.5.3
Capsule Assembly (Dwg. 9399407)
Moisture content
50 10/
3.2
4.5.8
Body Assembly (after painting) (Dwg. 9399402)
Salt Spray
4
4.5.2.2
Push test of rotating band 7/
50
3.2
4.5.10
Projectile Assembly
(Dwg. 9399374)
Functioning (single shot)
388 8-9 1/
4.5.6, 4.5.6.1,
8/
4.5.6.2
1000 meter, min. Test
288
3.4
4.5.6, 4.5.6.1
Sensitivity Test
100 1-2 9/
3.4
4.5.6, 4.5.6.2
Rapid fire functioning test, 150 to
656.2 feet
100 3-4 1/
3.4
4.5.6, 4.5.6.3
(200m)
Hot and cold temperature test
300 3/ 4/
3.4
4.5.6, 4.5.6.1,
4.5.6.2, 4.5.6.3
Petalling (missing petals)
200 5/
3.4
4.5.6, 4.5.6.2,
1-2 6/
4.5.6.3
Petalling (blown base)
200 5/
3.4
4.5.6, 4.5.6.2,
0-1
4.5.6.3
7
For Parts Inquires submit RFQ to Parts Hangar, Inc.
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business