MIL-DTL-0045585E (AR)
5. PACKAGING
5.1 Packaging. For acquisition purposes, the packaging requirements shall be as
specified in the contract or order (see 6.2). When packaging of materiel is to be
performed by DOD or in-house contractor personnel, these personnel need to contact the
responsible packaging activity to ascertain requisite packaging requirements. Packaging
requirements are maintained by the Inventory Control Point's packaging activities within
the Military Service or Defense Agency, or within the military service's system
commands. Packaging data retrieval is available from the managing Military
Department's or Defense Agency's automated packaging files, CD-ROM products, or by
contacting the responsible packaging activity.
6. NOTES
(This section contains information of a general or explanatory nature that may be helpful,
but is not mandatory.)
6.1 Intended use. The component covered by this specification is intended for use
with 40mm ammunition in the form of flexible belts.
6.2 Acquisition requirements. Acquisition documents should specify the
following:
a. Title, number and date of this specification.
b. Title, number (w/revision level) and date of all reference documents.
c. ASSIST Online to be cited in the solicitation, and, if required, the specific
issue of individual documents referenced (see 2.1.1).
d. Requirements for submission of first article sample.
e. Requirement for submission of design verification sample (if applicable).
f. Requirement for submission of inspection equipment designs.
g. Applicable national stock number.
h. Packaging requirements, if other than specified in Section 5.
i. Serialization requirements, if applicable.
j. Certificate of conformance for each lot or shipment of product, if applicable.
k. Government Furnished Material or equipment, if applicable.
6.3 Contractor acceptance inspection equipment (AIE). Provisions concerning the
contractor's AIE used to verify the requirements of this specification should be specified
in the contract.
6.4 Drawings. Drawings listed in /section 2 of this specification under the
heading U.S. Army Armament, Research, Development and Engineering Center
(ARDEC) may also include drawings prepared by, and identified as U.S. Army
Armament, Research and Development Command (ARRADCOM), Frankford Arsenal,
Rock Island Arsenal or Picatinny Arsenal drawings. Technical data originally prepared
by these activities is now under the cognizance of ARDEC.