MIL-DTL-0063092B (AR)
4. VERIFICATION
TABLE I. Requirement/inspection cross reference matrix
Method of inspection
Class of inspection
N/A - Not Applicable
A - First Article
1 - Analysis
B - Conformance
2 - Demonstration
3 Examination
4 Test
Inspection Methods
Section 3
Inspection Class
Section 4
Inspection Method
Requirement
N/A
1
2
3
4
A
B
3.1
X
X
X
X
4.3
3.2
X
X
X
X
X
4.4
3.3
X
X
X
4.5.7
3.4
X
X
X
X
X
4.5.11
3.5
X
X
X
4.5.12
3.6
X
X
X
4.5.4
3.7
X
X
X
4.5.13
3.8
X
X
X
4.5.2
3.9
X
X
X
4.5.19
3.10
X
X
X
4.5.5
4.1 Classification of inspections. The inspection requirements specified herein are
classified as follows:
a. First article inspection (see 4.3).
b. Conformance inspection (see 4.4).
4.2 Inspection Condition. Unless otherwise specified, all inspection shall be performed
in accordance with the test conditions specified in section 4.5 and 4.6.
4.3 First article inspection. When specified in the contract, a sample of the applicable
cartridge shall be subjected to first article verification in accordance with Table II and 4.3.2.
4.3.1 First Article Quantity. The contractor shall submit a first article as designated by
the Contracting Officer for evaluation in accordance with the provision of 4.3.2. The first article
sample shall consist of the following items in sample quantities as indicated:
Parts description
Drawings
Quantity
Cartridge Case Loading Assy. M195
9207988
360
Cartridge Case, M195, 40MM
9207989
100
Base Plug
8844611
50
Cup, Powder Charge
8844612
50
Illuminant Loading Assembly
9244310 / 9282351 / 9252412
25
Body (prior to painting)
9243900
10
Body (after painting)
9243900
5
5
For Parts Inquires submit RFQ to Parts Hangar, Inc.
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business