MIL-DTL-0060982C (AR)
4.3.3 First article rejection. If any item of the sample fails to comply with any of the
applicable requirements, the first article sample shall be rejected. The Government reserves the
right to terminate inspection upon failure of an assembly, component or test specimen to comply
with any of the requirements.
TABLE II. First Article Inspection
NO. OF
REQUIREMENT
INSPECTION
EXAMINATION OR TEST
SAMPLE
PARAGRAPH
METHOD
UNITS
Cartridge Case (Dwg. 8886329)
Hardness
25
3.2
4.5.2
Salt fog
5
3.7
4.5.3
Tensile properties
6
3.5
4.5.5
Diameter of vent holes
25
3.2
Gage
Base Plug (Dwg. 8886332)
Salt fog
10
3.7
4.5.3
Notes:
4.4 Conformance inspection.
4.4.1 Inspection lot formation. Lot formation shall be in accordance with MIL-STD-1916.
For the components identified below, each inspection lot of cartridges shall be produced with
components complying with the following constraints:
a. Metal parts or components from one interfix number, from one manufacturer
4.4.2 Classification of characteristics.
a. Sampling requirements. Inspection sampling requirements for Critical, Major, and
Minor characteristics are defined in MIL-STD-1916. Unless specified otherwise, Verification
Level IV shall be used for all characteristics defined as Majors and Verification Level II for all
Minor characteristics; Critical characteristics shall be addressed in accordance with MIL-STD-
1916.
b. Conformance inspection. Conformance inspection shall be performed in accordance
with paragraph 4.4.2.1 through 4.4.2.3. For all conformance inspections the same sample
specimen may be used for all non-destructive examinations or tests.
5
For Parts Inquires submit RFQ to Parts Hangar, Inc.
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business