MIL-DTL-0060945E (AR)
TABLE I. Requirement/verification cross reference matrix
Classes of verification
Method of verification
N/A - Not Applicable
A - First Article
1 - Analysis
B - Conformance
2 - Demonstration
3 - Examination
4 - Test
SECTION 4
VERIFICATION
VERIFICATION
SECTION 3
DESCRIPTION
VERIFICATION
METHODS
CLASS
REQUIREMENT
METHOD
N/A
1
2
3
4
A
B
3.1.1
FIRST ARTICLE
X
X
X
4.3
3.1.2
CONFORMANCE
X
X
X
4.4
PROJECTILE
3.2
X
X
X
X
4.3, 4.4
ASSEMBLY &
COMPONENTS
3.2.1
BODY
X
X
X
X
4.4.2.1, 4.5.1
PROJECTILE
3.2.2
X
X
X
X
4.4.2.2
ASSEMBLY
3.2.2.1
PUSH TEST
X
X
X
X
4.5.2
CHANGE IN
3.2.2.1.1
X
X
X
X
4.5.2.1, Table IV
KNURLING
CONFIGURATION
3.3
COATING THICKNESS
X
X
X
X
4.5.3
3.4
MARKINGS
X
X
X
4.5.4
AMMUNITION LOT
X
X
X
4.5.5
3.5
NUMBERING
3.6
WORKMANSHIP
X
X
X
4.4.2.1, 4.4.2.2
4.1 Classification of inspection. The inspection requirements specified herein are
classified as follows:
a. First article inspection (see 4.3).
b. Conformance inspection (see 4.4).
4.2 Inspection Condition. Unless otherwise specified, all inspection shall be performed in
accordance with the test conditions specified in section 4.5.
4.3 First Article. When specified, a sample of the Projectile Assembly, 40MM: Practice,
M385A1 shall be subjected to first article inspection in accordance with Table II and Table III.
4.3.1 First Article Quantity. The first article sample shall consist of the following items in
sample quantities as indicated in Table II and Table III.
4
For Parts Inquires submit RFQ to Parts Hangar, Inc.
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business