MIL-DTL-0060944B (AR)
4. VERIFICATION
TABLE I. Requirement/Inspection Cross Reference Matrix
Method of inspection
Classes of inspection
N/A - Not Applicable
A - First Article
1 - Analysis
B - Conformance
2 - Demonstration
3 - Examination
4 - Test
Inspection
Inspection Class
Section 3
Section 4
Methods
Requirement
Inspection Method
N/A
1
2
3
4
A
B
3.1
X
X
X
X
4.3
3.2
X
X
X
X
X
4.4, 4.5.1, 4.5.2, 4.5.3,
4.5.5, 4.5.7
3.3
X
X
X
4.5.6
3.4.1
X
X
X
4.5.8
3.4.2
X
X
X
X
4.5.4
3.5
X
X
X
4.5.10
3.6
X
X
X
4.5.11
4.1 Classification of inspection. The inspection requirements specified herein are classified as
follows:
a. First article inspection (see 4.3).
b. Conformance inspection (see 4.4).
4.2 Inspection conditions. Unless otherwise specified, all inspection shall be performed in
accordance with the test conditions specified in section 4.5.
4.3 First article. When specified in the solicitation or contract, a sample of cartridges, 40MM:
practice, M385A1 and subcomponents shall be subjected to first article inspection in accordance with
Table II and 4.3.1.
4.3.1 First article quantity. The contractor shall submit a first article as designated by the
Contracting Officer for evaluation in accordance with the provision of 4.3.2. The first article sample
shall consist of the following items in sample quantities as indicated.
Drawings
Quantity
Parts description
Cartridge Case Assembly
8886327
25
Cartridge
8886326
240
Linked Ammunition
8886405
50
4.3.2 Inspections to be performed. The first article inspection shall be 100 % examination of
all drawing characteristics (listed and unlisted) including workmanship requirements for the parts and
assemblies listed in 4.3.1 and the tests specified in Table II herein.
4
For Parts Inquires submit RFQ to Parts Hangar, Inc.
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business