MIL-C-60941A (MU)
3.3 Workmanship. -All parts and assemblies shall be fabricated and
finished in a thorough, workmanlike manner. They shall be free of burrs,
chips, sharp edges, cracks, unblended radii, surface defects, dirt, grease,
rust, corrosion products and other foreign matter. The cleaning methods
used shall not be injurious to any parts, nor shall the parts be contaminated by
the cleaning agents.
3.4 Submission of results of contractor-conducted examinations
and tests. -The contractor shall forward copies of the results of any of
his examinations or tests to the designated address as required by the
contract. (See 6.4)
3.5 First article testing.-This specification marks provisions for
first article testing. Submission of first article quantity by the
contractor shall be as specified in the contract.
4.
QUALITY ASSURANCE PROVISIONS
4.1 Responsibility for inspection.-Unless otherwise specified in
the contract or purchase order, the supplier is responsible for the
performance of all inspection requirements as specified herein. Except
as otherwise specified in the contract or order, the supplier may use
his own or any other facilities suitable for the performance of the,
inspection requirements specified herein, unless disapproved by the
Government. The Government reserves the right to perform any of the
inspections set forth in the specification where such inspections are
deemed necessary to assure supplies and services conform to prescribed
requirements. Reference shall be made to MIL-STD-109 to define terms
used herein. The provisions of MIL-A-2550 shall apply.
4.1.1 Submission of product. -At the time the completed lot of items
deliverable under the contract is submitted to the Government for
acceptance, the contractor shall supply the following information
accompanied by a certificate which attests that the information provided
is correct and applicable to the product being submitted:
a. A statement that the lot complies with all the quality
assurance provisions specified in this specification.
b. Drawing and specification number and date, together with
identification and date of changes thereto.
c. A statement that all material purchased by the contractor
meets requirements, when such material is controlled by Government
or commercial specifications referenced in any of the contractual documents,
and that certificates of conformance are on file and available for review.
d. Number of items in the lot.
e. Date submitted.
3
For Parts Inquires submit RFQ to Parts Hangar, Inc.
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business