MIL-C-60941A (MU)
6.3 Inspection equipment. -The contractor shall design inspection
equipment as required by the referenced Equipment Lists (EL) in accordance
with the instructions of paragraphs 6.3.1. through 6.3.5.
6.4 Equipment lists.-Equipment lists indicate the availability of
inspection-equipment designs by showing in the "Part Number" column of
the list of inspection equipment (Form SMUPA 1010) the numbers of drawings
or Federal Stock numbers of existing equipment designs, or codes as indicated
in paragraph 6.3.2. Design action required of the contractor is described
in paragraphs 6.3.3 and 6.3.4. The contractor will be required to prepare
detailed drawings in accordance with 6.3.4 for all the equipment coded
as "Contractor Design" in the "Part Number" column. These contractor designs
must be approved by the Government prior to fabrication or procuring of
the equipment. Designs shall be submitted for approval as specified in
6.3.5.
6.3.2 Equipment list codes.-The inspection equipment as defined in.
6.3.3 and 6.3.4 will be designated in the EL by the following codes:
CD - Contractor design. on controlled contractor
format and/or commercial equipment.
MU - Army design, mandatory for use.
6.3.3 Army designs.-Army designs are reflected on detailed drawings
which completely depict all the information necessary for the fabrication
of the item of inspection equipment. The contractor need provide no design
when an Army design is listed for an item of inspection equipment. Army
designs fall into two basic classifications: Mandatory (designated "MU")
and non-mandatory (indicated by drawing or Federal Stock Number). When
an equipment list references mandatory Army Designs, the contractor shall
comply with, and use these designs accordingly. The contractor may, how-
ever, in connection with non-mandatory designs, with the approval of
the Government, design alternate inspection equipment to facilitate
his operations. Such contractor-prepared designs (see 6.3.4) or commercial.
equipment selections must be approved by the Government prior to fabrication
or procuring of the equipment. Desires shall be submitted for approval as
specified in 6.3.5.
6.3.4 Contractor designs.-Contractor designs are designs of
inspection equipment for which the Government has assigned design
responsibility to the contractor. Contractor designs shall be supported
by detailed drawings which depict all information necessary to completely
fabricate, calibrate and operate an item of inspection equipment. This
requires that the necessary views, dimensions, materials, finishes, notes
and calibration instructions be properly depicted in accordance with approved
practices to the extent that further calculation or clarification will not
be required. Unless otherwise specified, contractor designs may be
developed on the format the contractor normally employs in his equipment
design procedure provided such format reflects the detail and information
specified above, subject to the following controls: All submitted
10
For Parts Inquires submit RFQ to Parts Hangar, Inc.
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business