MIL-C-70501 (AR)
4.4 Quality
conformance
inspection.
Inspection lots shall
4.4.1
Inspection lot formation.
comply with the lot formation provisions of MIL-A-48078.
a.
Each lot of container tops and bottoms shall contain
parts produced from:
Nitrocellulose paper from not more than one lot from one
manufacturer.
Each lot of container assemblies shall contain parts
b.
produced from:
(1) Container tops and container bottoms from not more
than one manufacturer and one lot.
(2) Silicone from one manufacturer.
(3) Hexane from one manufacturer.
(4) Acetone from one manufacturer.
(5) MR-23 from one batch from one manufacturer.
See MIL-A-48078. Conditioning shall
4.4.2 Examination.
be at 23 ± 2°C and 50 ± 5% R.H. for a minimum of 4 hours.
Unless otherwise specified in the Classification of Defects and
Test tables, sampling plans for major and minor defects shall
be in accordance with MIL-STD-105, Inspection Level II.
4.4.2.1
Mold examination and process requirements.
4.4.2.1.1 Qualification for new or rework die-Press
set-ups. Qualification of new or reworked die-press set-ups
shall be in accordance with 4.3.4.
4.4.2.1.2 Process
requirements.
a.
Homogeneity inspection will be performed prior to
assembly of container halves.
8
For Parts Inquires submit RFQ to Parts Hangar, Inc.
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business