MIL-C-63062 (PA)
4.3.1 Submission - The contractor shall submit a first
article as designated by the Contracting Officer for evaluation
in accordance with the provisions of 4.3.2. The first article
sample shall consist of the following items in sample quantities
as indicated.
Quantity
Drawings
Part Description
50
9206911
Cup, Closing
4.3.2 Inspections to be Performed - See MIL-A-48078 and
Table 1 herein.
4.3.3 Rejection - See MIL-A-48078.
3
For Parts Inquires submit RFQ to Parts Hangar, Inc.
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business