MIL-C-63062 (PA)
DRAWINGS
PICATINNY ARSENAL
9206911
- Cup, Closing
REQUIREMENTS
3.
3.1 Material - Materials shall be in accordance with the
applicable drawings and specifications.
3.2 Part - The part shall comply with all requirements
specified on Drawing (Dwg.) 9206911; all associated drawings
and with all requirements specified in applicable specifications.
3.3 Workmanship - All parts and assemblies shall be fabri-
cated and finished in a thorough, workmanlike manner. They
shall be free of burrs, chips, sharp edges, cracks, unblended
radii, surface defects, dirt, grease, rust, corrosion products,
and other foreign matter. The cleaning method used shall not
be injurious to any parts, nor shall the parts be contaminated
by the cleaning agents. All marking and stamping shall be neat
and sharply defined.
3.4 First Article Inspection - This specification contains
technical provisions for first article inspection. Require-
ments for the submission of first article samples by the con-
tractor shall be as specified in the contract.
4.
QUALITY ASSURANCE PROVISIONS
4.1 Responsibility for Inspection and Standard Quality
Assurance Provisions - Unless otherwise specified herein or in
the contract, the provisions of MIL-A-48078 shall apply and
are hereby made a part of this detail specification.
4.2 Classification of Inspections - The following types
of inspection shall be conducted on this item:
a.
First Article Inspection
b.
Quality Conformance Inspection
4.3 First Article Inspection -
2
For Parts Inquires submit RFQ to Parts Hangar, Inc.
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business