MIL-C-60943A
(MU)
3.7 Workmanship. -All parts and assemblies shall be fabricated, loaded and
assembled in a thorough, workmanlike manner. They shall be free of burrs, sharp
edges, cracks, dirt, grease, rust and other foreign matter. The cleaning method
used shall not be injurious to any part, nor shall the parts be contaminated by
the cleaning agents. Exterior surface coatings shall be continuous except for a
few light scratches not exposing base material. All required markings shall be
neat and sharply defined.
3.8 Submission of results of contractor-conducted examinations and tests.-
The contractor shall forward copies of the results of any of his examinations or
tests to the designated address as required by the contract, the specification,
or as requested by the Contracting Officer. (See 6.10)
4.
QUALITY ASSURANCE PROVISIONS
4.1 General quality assurance provisions. -Unless otherwise specified in the
contract or purchase order, the supplier is responsible for the performance of
all inspection requirements as specified herein. Except as otherwise specified,
the supplier may utilize his own facilities or any commercial laboratory acceptable
to the Government. The Government reserves the right to perform any of the inspections
set forth in the specification where such inspections are deemed necessary to
assure supplies and services conform to prescribed requirements. Reference shall
be made to MIL-STD-109 in order to define terms used herein. The provisions of
MIL-A-2550 shall apply.
4.1.1 Submission of product. -At the time the completed lot of product is
submitted to the Government for acceptance, the contractor shall supply the
following information accompanied by a certificate which attests that the information
provided is correct and applicable to the product being submitted:
a. A statement that the lot complies with all the quality assurance
provisions specified within this specification.
b. Number of units of product inspected.
c. Results obtained, by code number, for all inspections performed,
d. Drawing, specification number and date, together with an
identification and date of changes.
e. Certificates of conformance on all material purchased by the
contractor when such material is controlled by Government or commercial
specifications referenced in any of the contractual documents.
f. Number of items in the lot.
g. Date submitted.
4