MIL-C-48654(AR)
MIL-STD-414 - Sampling Procedures and Tables for
Inspection by Variables for Percent
Defective
2.1.2 Other Government documents, drawings, and
publications. The following other Government documents, drawings,
and publications form a part of this specification to the extent
specified herein.
DRAWINGS (See 6.5)
US ARMY ARMAMENT RESEARCH AND DEVELOPMENT CENTER (ARDC)
PRODUCT AND PACKAGING DRAWINGS
12630941 - Cartridge, Ignition, M702A1 Loading Assembly
9287826 - Packing and Marking for Box, Fiberboard,
Packing, for Cartridge Ignition, M702
INSPECTION EQUIPMENT DRAWINGS
- Envelope Drawing for Leak Testing of Ignition
9278622
Cartridges
(Copies of specifications, standards, handbooks, drawings, and
publications required by manufacturers in connection with specific
acquisition functions should be obtained from the contracting
activity or as directed by the contracting officer.)
2.1.3 Order of precedence. In the event of a conflict
between the text of this specification and the references cited
herein, the test of this specification will take precedence.
3.
REQUIREMENTS
3.1 Material. Materials shall be in accordance with
applicable drawings and specifications.
3.2 Assembly. The ignition cartridge assembly and components
shall comply with all requirements specified on Drawing (dwg)
12630941 and with all requirements specified in applicable
specifications, associated drawings and standards.
3.3 Moisture content of black powder. The moisture content
of the black powder used in loading the ignition cartridge, at the
time of loading, shall not exceed 0.50 percent. Testing shall be
as specified in 4.5.1.
2
For Parts Inquires submit RFQ to Parts Hangar, Inc.
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business