(Ord)
MIL-C-46236
TABLE II
4.3.4.3.2 Production Lot Sample. - Thirty
cartridge cases from each production lot of 25,000 or less will be ballistically
tested in the excess pressure phase. Lots which exceed 25,000 cartridge cases,
one additional cartridge case will be tested for every one thousand cases (or
fraction thereof) above 25,000. Acceptance and rejection criteria shall be in
accordance with Table III.
TABLE III
4.3.5 Process Control. - Monitoring at unscheduled intervals will be
conducted for the following process operations to determine compliance with
following requirements.
- 3.4
Annealing
Stress Relief - 3.5
Mouth Anneal - 3.6
Failure to comply with the requirements shall be cause for rejection of all
units processed since the last monitored approval of the process.
4.3.6 Inspection Equipment - The examination and tests shall be
made using equipment listed on IEL-8596159, except as provided in 4.3. The
9
For Parts Inquires submit RFQ to Parts Hangar, Inc.
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business