MIL-P-64036(AR)
Loss or breakup of any component, in the mortar tube or
b.
in flight.
Short rounds due to undetermined cause.
c.
3.9 First article. When specified in the contract or purchase
order, a sample shall be subjected to first article inspection in
(See 4.3 and 6.2).
accordance with the technical provisions herein.
3.10. Workmanship. All parts and assemblies shall be
fabricated in a thorough workmanlike manner. Threads shall be full
and undamaged for the entire minimum length as required by the
applicable drawings. No part shall have a burr which might be
injurious to personnel handling the item. No part or assembly shall
contain dirt, grease, chips, rust, corrosion, or other foreign
matter. Particular attention shall be given to the cavity of the
body assembly, to insure that no grit, scale, accumulated braze
alloy, residual flux or other foreign matter remains therein after
final cleaning. Projectile assemblies shall be prepared for
painting in accordance with TT-C-490. The cleaning method used
shall not be injurious to any part nor shall parts be contaminated
by the cleaning agent. All required markings shall be neat and
sharply defined.
4.
QUALITY ASSURANCE PROVISIONS
4.1 Responsibility for inspection. Unless otherwise specified
in the contract or purchase order, the contractor is responsible for
the performance of all inspection requirements as specified herein.
Except as otherwise specified in the contract or purchase order, the
contractor may use his own or any other facilities suitable for the
performance of the inspection requirements specified herein, unless
disapproved by the Government. The Government reserves the right to
perform any of the inspections set forth in the specification where
such inspections are deemed necessary to assure supplies and
services conform to prescribed requirements. Unless otherwise
specified herein or in the contract, the provisions of MIL-A-48087
shall apply and are hereby made a part of this detail specification.
4.1.1 Responsibility for compliance. All items must meet all
requirements of section 3 and 5. The inspections set forth in this
specification shall become a part of the contractor's overall
inspection system or quality program. The absence of any inspection
requirements in the specification shall not relieve the contractor
of the responsibility of assuring that all products or supplies
submitted to the Government for acceptance comply with all
5
For Parts Inquires submit RFQ to Parts Hangar, Inc.
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business