MIL-C-60983C (PA)
3.8 Production control check on loaded M118 cartridge cases.-
There shall be no evidence of a primer malfunction.
3.9 Functioning.-
3.9.1 Cartridge. -The cartridge shall function satisfactorily
and the projectile shall have a mean velocity of 247 plus or minus
(±) 7 feet-per-second and a standard deviation not exceeding 4.5
feet-per-second.
3.9.2 Safety. -There shall be no premature burst (See 6.8)
or evidence thereof in any of the test firings.
3.10 Workmanship. -All parts and assemblies shall be
fabricated, loaded and assembled in a thorough, workmanlike
manner. They shall be free of burrs, sharp edges, cracks,
dirt, grease, rust, and other foreign matter. The cleaning
method used shall not be injurious to any parts, nor shall
the parts be contaminated by the cleaning agents. Exterior
surface coatings shall be continuous; however, a few light
scratches not exposing base material may be permitted. All
required marking and stamping shall be neat and sharply defined.
3.11 Submission of results of contractor-conducted
examinations and tests. -The contractor shall forward copies
of the results of any of his examinations or tests to the
designated address as required by the contract. (See 6.4).
4.
QUALITY ASSURANCE PROVISIONS
4.1 Responsibility for Inspection and Standard Quality
Assurance Provisions. -Unless otherwise specified herein or
in the contract, the provisions of MIL-A-48078 (PA) shall apply
and are hereby made a part of this detail specification.
4.2 Classification of Inspections. -The following types
of inspection shall be conducted on this item:
Quality Conformance Inspection
a.
4.3 First Article Inspection.-
Not applicable to this specification.
4
For Parts Inquires submit RFQ to Parts Hangar, Inc.
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business